Military Department
Tri Cities Readiness Center
30000808
The Bellingham Armory was closed in 2012, displacing Washington National Guard members into a constrained number of Readiness Centers and prompting the need for additional, modern facilities. This project will construct a new Readiness Center in the Tri Cities on a 40-acre parcel of land acquired by the Military Department in a previous biennium, creating a new modern space for Guard members in support of state and federal missions. A reappropriation of funds is also granted.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
900,000 | 3,000 | 797,000 | 15,200,000 | 0 | 16,900,000 |
Funds: General Fund - Federal | 11,900,000 |
Funds: State Building Construction Account - State | 5,000,000 |
Centralia Readiness Center
30000818
The Centralia Readiness Center is an outdated facility that lacks an elevator for personnel. The first and second floors are elevated with multiple steps at the main entry. The building has concrete walls, no insulation and no outside air intake to ventilate the enclosed space. This project will renovate the facility to improve functional areas and bring the facility up to building code, including the kitchen, restrooms and workspaces, and create an ADA compliant facility. A reappropriation of funds is also granted.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 357,000 | 2,018,000 | 2,000,000 | 0 | 4,375,000 |
Funds: General Fund - Federal | 4,375,000 |
Kent Readiness Center
30000917
The Kent Readiness Center is outdated both in technology and finishing. This project will create an ADA compliant facility, and design and renovate the facility's functional areas to include the kitchen, restrooms, showers and office. Upgrades will be made to the facility's flooring, ceiling, lighting and painting. Outdated equipment, appliances, doors and windows will also be replaced to increase energy efficiency of the facility.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 4,530,000 | 0 | 4,530,000 |
Funds: General Fund - Federal | 4,150,000 |
Funds: State Building Construction Account - State | 380,000 |
Anacortes Readiness Center Major Renovation
40000004
The Anacortes Readiness Center is one of the smallest facilities in the Washington National Guard inventory. It has no female restrooms, showers and locker rooms; lacks office space and classrooms for training purposes; has an inadequate supply room for necessary equipment; and is not ADA compliant. This project will perform predesign for an ADA compliant facility, which will add 6,000 square feet of new space; renovate offices, classrooms, the kitchen, and supply and storage areas; and create a new locker room, restrooms and showers for female members.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 75,000 | 0 | 75,000 |
Funds: State Building Construction Account - State | 75,000 |
Minor Works Preservation 2019-21 Biennium
40000036
Minor works preservation funding is provided to repair, preserve and extend the life of state and federally supported Military Department facilities.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 7,980,000 | 0 | 7,980,000 |
Funds: General Fund - Federal | 5,224,000 |
Funds: State Building Construction Account - State | 2,756,000 |
Minor Works Program 2019-21 Biennium
40000037
Minor works programmatic funding is provided to modernize or enhance Washington Military Department facilities in order to support its state and federal missions.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 23,998,000 | 0 | 23,998,000 |
Funds: General Fund - Federal | 21,630,000 |
Funds: State Building Construction Account - State | 2,259,000 |
Funds: Military Department Capital Account - State | 109,000 |
Camp Murray Soldiers Memorial Park
40000062
There is an opportunity to honor service members, including those who were wounded or killed in action. This project will create a memorial park with nature trails that will be developed through a stand of native oak trees and provide environmental education opportunities. Monuments will be erected to memorialize the service of Washington National Guard members.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 600,000 | 0 | 600,000 |
Funds: Military Department Capital Account - State | 600,000 |
Stryker Canopies Kent Site
40000073
The Washington Army National Guard recently acquired Stryker vehicles and is transitioning its 81st Brigade into a Stryker Brigade. Strykers are light, agile vehicles that can travel on area roadways and greatly assist our communities during a disaster response. The wet weather conditions in the Pacific Northwest can cause a lot of damage to the costly Strykers since they are prone to taking in rain water. This project will design and construct a canopy at the Kent site that will protect and prolong the life of the assets within the 81st Stryker Brigade Combat Team.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 3,000,000 | 0 | 3,000,000 |
Funds: General Fund - Federal | 3,000,000 |
Stryker Canopies Bremerton Site
40000077
The Washington Army National Guard recently acquired Stryker vehicles and is transitioning its 81st Brigade into a Stryker Brigade. Strykers are light, agile vehicles that can travel on area roadways and greatly assist our communities during a disaster response. The wet weather conditions in the Pacific Northwest can cause a lot of damage to the costly Strykers since they are prone to taking in rain water. This project will design and construct a canopy at the Bremerton site that will protect and prolong the life of the assets within the 81st Stryker Brigade Combat Team.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 1,500,000 | 0 | 1,500,000 |
Funds: General Fund - Federal | 1,500,000 |
Montesano Field Maintenance Shop (FMS) Addition
40000095
The existing Field Maintenance Shop is not equipped to support recently acquired Stryker vehicles, which are lighter, more agile vehicles that can be used on area roadways to assist communities during a disaster response. Stryker vehicles require a facility that is modern and large enough to maintain the high-tech equipment. This project will upgrade the shop with an overhead crane and improve other areas, including parking, work bays and the electronic testing room, and the IT, electrical and mechanical systems.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 3,000,000 | 0 | 3,000,000 |
Funds: General Fund - Federal | 3,000,000 |
Joint Base Lewis-McChord (JBLM) 3106 Helicopter Port
40000100
The Aviation Facility does not have a cover for aircrafts when they are parked in the hangar and not in use. The hangars have limited space to accommodate all Military Department aircraft. Weather elements, such as sun, heat, rain, snow and wind accelerate the wear and tear of the specific sheet metal of the aircraft. This project will construct a helicopter overhead cover that will protect and prolong aircrafts.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 2,000,000 | 0 | 2,000,000 |
Funds: General Fund - Federal | 2,000,000 |
Air Support Operations Group (ASOG) Complex
40000163
The Military Department has a shortfall of administrative space. This project will design and construct a single-story, 56,000 square foot Air Support Operations Group complex with administrative and warehouse space, and a 15,000 square foot vehicle operations parking shed that will house over 200 Air National Guard members serving in units at Camp Murray.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 4,766,000 | 27,622,000 | 32,388,000 |
Funds: General Fund - Federal | 32,388,000 |
Mission Support Group/Logistics/Communications (MSG-Comm)Facility
40000167
The Military Department has a shortfall of administrative space. This project will include predesign and begin design of a single-story, 28,710 square foot facility with administrative space, network control center, deployment processing center, shipping and receiving, and warehouse to support operations and training.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 2,114,000 | 31,284,000 | 33,398,000 |
Funds: General Fund - Federal | 33,398,000 |