Capital Budgeted Expenditures

461 - Department of Ecology

Last Updated: 10/08/2025

Through September 2025

Auth Code Fund Reapprop Provisos Current Biennium Appropriation Budgeted Cost of Work (Allotted) Actual Cost of Work Outstanding Contracting Balance (Encumbered) Total Dollars Obligated Percent Obligated Percent Expended Biennium to Date Variance (Allotted - Actuals)
This Month Biennium to Date This Month Biennium to Date
19972012 - Low-Level Nuclear Waste Disposal Trench
J00 125 Y N 1,497,000 750,136 1,937,190 1,937,190 129.4% 750,136
20042951 - Twin Lake Aquifer Recharge Project
G28 057 Y N 129,000 60,000 60,000
20081951 - Transfer of Water Rights for Cabin Owner
I05 057 Y N 57,000 28,000 56,924 56,924 99.86% 28,000
30000216 - Remedial Action Grant Program
A02 23N Y N 12,414,000 3,334,334 65,212 3,403,325 3,468,537 27.94% 0.52% 3,269,122
30000280 - ASARCO - Tacoma Smelter Plume and Mines
K15 15H Y N 2,071,000 744,228 57,639 57,639 2.78% 744,228
30000331 - Watershed Plan Implementation and Flow Achievement
S07 057 Y N 857,000 200,000 200,000
30000333 - Dungeness Water Supply & Mitigation
S09 057 Y N 242,000 97,000 2,441 2,441 1% 1% 94,559
30000334 - ASARCO Cleanup
S11 15H Y N 387,000 321,082 40,208 299,735 339,943 87.84% 10.38% 280,874
30000432 - Eastern Washington Clean Sites Initiativ
A09 23N Y N 542,000 346,210 20,300 317,645 337,945 62.35% 3.74% 325,910
30000458 - Remedial Action Grants
U57 057 Y N 8,262,000 3,691,112 60,901 5,394,125 5,455,026 66.02% 0.73% 3,630,211
30000538 - ASARCO Cleanup
T26 15H Y N 51,000
30000542 - Cleanup Toxics Sites - Puget Sound
A13 23N Y N 1,321,000 453,442 50,494 867,865 918,359 69.51% 3.82% 402,948
30000589 - Sunnyside Valley Irrigation District Wat
T25 057 Y N 1,125,000 550,000 550,000
30000590 - Yakima River Basin Water Supply
A54 355 Y N 294,000 140,000 140,000
30000591 - Watershed Plan Implementation and Flow A
T97 057 Y N 875,000 425,000 50,388 50,388 5.75% 425,000
30000670 - ASARCO Cleanup
U05 15H Y N 4,833,000 1,560,000 131,213 4,098,652 4,229,865 87.52% 2.71% 1,428,787
30000673 - Sunnyside Valley Irrigation District Wat
U78 057 Y N 1,653,000 750,000 283,446 283,446 17.14% 17.14% 466,554
30000712 - Columbia River Water Supply Development
U47 296 Y N 689,000 320,000 320,000
U56 057 Y N 556,000 180,000 13,867 13,867 2.49% 2.49% 166,133
Totals 1,245,000 500,000 668,082 13,867 1.11% 1.11% 486,133
30000712 - Columbia River Water Supply Development Program
U98 10P Y N 3,645,000 1,680,000 10,483 1,031,601 1,042,084 28.58% 0.28% 1,669,517
30000714 - Watershed Plan Implementation and Flow A
U91 057 Y N 3,287,000 1,600,000 60,239 3,201,214 3,261,453 99.22% 1.83% 1,539,761
30000740 - Water Irrigation Efficiencies Program
U33 057 Y N 204,000 100,000 100,000
30000742 - 2017-19 Eastern Washington Clean Sites I
A17 23N Y N 1,676,000 1,478,958 61,416 1,138,577 1,199,993 71.59% 3.66% 1,417,542
30000763 - 2015-17 Restored Clean Up Toxics Sites -
U62 057 Y N 658,000 591,557 556,475 1,378 557,853 84.78% 84.57% 35,082
40000018 - VW Settlement Funded Projects
M22 001 Y N 60,278,000 6,907,153 917,730 11,201,090 12,118,820 20.1% 1.52% 5,989,423
40000109 - Reduce Air Pollution from Transit/Sch. B
U07 216 Y N 2,302,000 1,018,247 10,656 1,058,149 1,068,805 46.42% 0.46% 1,007,591
40000111 - Historical Adjustments
A23 057 Y N 2,330,000 1,000,000 1,000,000
40000114 - 2019-21 ASARCO Cleanup
A24 15H Y N 4,844,000 2,370,120 99,938 304,625 404,563 8.35% 2.06% 2,270,182
40000116 - 2019-21 Centennial Clean Water Program
A26 057 Y N 2,304,000 945,000 184,782 1,282,439 1,467,221 63.68% 8.02% 760,218
40000117 - 2019-21 Eastern Washington Clean Sites I
A27 23N Y N 11,273,000 4,268,976 63,669 3,356,577 3,420,246 30.34% 0.56% 4,205,307
40000127 - Padilla Bay Federal Capital Projects
L00 001 Y N 500,000 31,555 31,555
40000129 - 2019-21 Floodplains by Design
A30 057 Y N 14,795,000 3,737,542 1,164,762 6,305,886 7,470,648 50.49% 7.87% 2,572,780
40000130 - 2019-21 Clean Up Toxics Sites – Puget So
A32 23N Y N 5,521,000 1,550,121 448,012 1,035,190 1,483,202 26.86% 8.11% 1,102,109
40000144 - 2019-21 Stormwater Financial Assistance
A33 23R Y N 12,152,000 3,200,000 881,419 12,775,090 13,656,509 112.38% 7.25% 2,318,581
40000146 - 2015 Drought Authority
A34 05W Y N 634,000 280,000 266,358 318,710 585,068 92.28% 42.01% 13,642
40000152 - 2019-21 Columbia River Water Supply Deve
A39 296 Y N 1,464,000 190,000 85,892 85,892 5.86% 190,000
A40 057 Y N 9,371,000 4,500,000 70,947 8,642,267 8,713,214 92.98% 0.75% 4,429,053
Totals 10,835,000 4,690,000 5,464,968 8,728,159 8,799,106 81.21% 0.65% 4,619,053
40000152 - 2019-21 Columbia River Water Supply Development Program
A41 355 Y N 9,990,000 4,850,000 4,850,000
40000177 - 2019-21 Streamflow Restoration Program
A42 366 Y N 17,697,000 7,900,000 2,402,073 12,485,520 14,887,593 84.12% 13.57% 5,497,927
40000179 - 2019-21 Yakima River Basin Water Supply
A43 057 Y N 5,727,000 2,200,000 307,688 3,898,029 4,205,717 73.43% 5.37% 1,892,312
40000193 - Zosel Dam Preservation
A44 057 Y N 78,000 38,000 38,000
40000194 - 2019-21 Protect Investments in Cleanup R
A45 23N Y N 2,158,000 875,000 21,449 847,147 868,596 40.25% 0.99% 853,551
40000211 - 2019-21 Remedial Action Grants
A49 23N Y N 23,334,000 4,808,229 752,874 10,072,974 10,825,848 46.39% 3.22% 4,055,355
40000288 - 2020 Remedial Action Grants
A57 23N Y N 10,923,000 4,390,364 471,697 6,329,417 6,801,114 62.26% 4.31% 3,918,667
40000303 - 2021-23 ASARCO Everett Smelter Plume Cleanup
C00 23N Y N 9,973,000 5,775,000 720,609 4,804,872 5,525,481 55.4% 7.22% 5,054,391
40000304 - 2021-23 Remedial Action Grant Program
C01 23N Y N 60,730,000 10,569,057 557,681 28,661,438 29,219,119 48.11% 0.91% 10,011,376
40000336 - 2021-23 Stormwater Financial Assistance
C02 23R Y N 39,122,000 12,350,000 2,979,817 19,112,576 22,092,393 56.47% 7.61% 9,370,183
40000340 - 2021-23 Eastern Washington Clean Sites I
C06 23N Y N 18,938,000 2,105,441 2,105,442 2,105,442 11.11% 2,105,441
40000346 - 2021-23 Clean Up Toxic Sites – Puget Sou
C07 23N Y N 3,344,000 829,849 1,361,991 673,098 2,035,089 60.85% 40.72% (532,142)
40000359 - 2021-23 Centennial Clean Water Program
C08 23N Y N 18,342,000 5,550,000 4,167,035 9,779,075 13,946,110 76.03% 22.71% 1,382,965
40000360 - 2021-23 Protect Investments in Cleanup R
C09 23N Y N 7,778,000 2,792,824 73,223 964,100 1,037,323 13.33% 0.94% 2,719,601
40000371 - 2021-23 Reducing Toxic Wood Stove Emissi
C10 23N Y N 14,000 14,000 14,000
40000378 - 2021-23 Healthy Housing Remediation Prog
A51 23N Y N 2,080,000 963,113 89,385 1,291,533 1,380,918 66.39% 4.29% 873,728
40000386 - 2021-23 ASARCO Tacoma Smelter Plume Clea
C14 15H Y N 3,000,000
40000387 - 2021-23 Chehalis Basin Strategy
C15 057 Y N 24,930,000 8,998,989 196,971 26,227,372 26,424,343 105.99% 0.79% 8,802,018
40000388 - 2021-23 Coastal Wetlands Federal Funds
N02 001 Y N 2,383,000 981,233 100,386 7,519,263 7,619,649 319.75% 4.21% 880,847
40000389 - 2021-23 Floodplains by Design
C16 057 Y N 15,264,000 7,358,291 1,090,228 13,606,383 14,696,611 96.28% 7.14% 6,268,063
40000390 - 2021-23 Reducing Diesel GHG & Toxic Emis
C17 23N Y N 2,236,000 1,192,172 51,010 476,291 527,301 23.58% 2.28% 1,141,162
40000391 - 2021-23 Sunnyside Valley Irrigation Dist
C18 057 Y N 3,903,000 1,800,000 9,966 9,966 0.25% 0.25% 1,790,034
40000396 - 2021-23 Puget Sound Nutrient Reduction G
C19 057 Y N 4,467,000 2,869,000 253,701 2,814,796 3,068,497 68.69% 5.67% 2,615,299
40000397 - 2021-23 Streamflow Restoration Program
C20 366 Y N 30,369,000 14,700,000 827,802 20,939,545 21,767,347 71.67% 2.72% 13,872,198
40000399 - 2021-23 Columbia River Water Supply Deve
C21 296 Y N 1,329,000 440,000 50,642 14,201 64,843 4.87% 3.81% 389,358
C22 057 Y N 31,169,000 15,000,000 1,348,627 8,673,010 10,021,637 32.15% 4.32% 13,651,373
Totals 32,498,000 15,440,000 23,299,823 8,687,211 10,086,480 31.04% 4.31% 14,040,731
40000422 - 2021-23 Yakima River Basin Water Supply
C23 057 Y N 15,270,000 7,494,000 115,908 15,058,463 15,174,371 99.37% 0.75% 7,378,092
40000436 - 2021-23 Product Replacement Program
C24 23N Y N 1,224,000 370,115 108,535 229,841 338,376 27.64% 8.86% 261,580
40000464 - Pacific Wood Treating Site Cleanup – Cle
C29 15H Y N 2,006,000 1,942,951 155,073 1,787,878 1,942,951 96.85% 7.73% 1,787,878
40000465 - 2022 Clean Up Toxic Sites – Puget Sound
C30 23N Y N 3,737,000 3,737,000 3,737,000 100%
40000470 - 2022 Community-Based Public-Private Stor
C32 23R Y N 405,000 255,852 52,001 231,622 283,623 70.03% 12.83% 203,851
40000473 - 2022 Water Pollution Control Revolving P
C33 727 Y N 194,063,000 111,204,410 56,568,017 361,512,689 418,080,706 215.43% 29.14% 54,636,393
40000474 - 2023-25 Reducing Diesel Greenhouse Gases (GHG) and Toxic Emissions
D00 23N Y N 13,036,000 213,364 4,213,433 30,966,151 35,179,584 269.86% 32.32% (4,000,069)
40000475 - 2023-25 Coastal Wetlands Federal Funds
Q00 001 Y N 14,000,000 5,620,170 9 2,940,000 2,940,009 21% 0% 5,620,161
40000476 - 2023-25 Chehalis Basin Strategy Projects
D07 057 Y N 56,450,000 15,491,501 2,357,096 51,813,971 54,171,067 95.96% 4.17% 13,134,405
40000477 - 2023-25 Freshwater Aquatic Invasive Plan
D02 222 Y N 1,035,000 345,000 75,279 527,335 602,614 58.22% 7.27% 269,721
40000478 - 2023-25 Freshwater Algae Grant Program
D03 10A Y N 542,000 184,713 67,940 239,040 306,980 56.63% 12.53% 116,773
40000479 - 2023-25 Reducing Toxic Wood Stove Emissions
D05 23N Y N 1,606,000 75,941 165,968 88,933 254,901 15.87% 10.33% (90,027)
40000480 - 2023-25 Affordable Housing Cleanup Grant
D09 23N Y N 8,683,000 1,107,001 83,529 2,614,360 2,697,889 31.07% 0.96% 1,023,472
40000486 - 2023-25 Product Replacement Program
D10 23N Y N 5,336,000 2,395,625 19,583 515,742 535,325 10.03% 0.36% 2,376,042
40000487 - 2023-25 Clean Up Toxic Sites – Puget Sou
D11 23N Y N 7,455,000 600,000 87,027 212,974 300,001 4.02% 1.16% 512,973
40000495 - 2023-25 Remedial Action Grant Program
D12 23N Y N 112,943,000 19,773,252 431,013 15,761,363 16,192,376 14.33% 0.38% 19,342,239
40000526 - 2023-25 Protect Investments in Cleanup R
D13 23N Y N 4,358,000 400,000 400,000
40000529 - 2023-25 ASARCO Everett Smelter Plume Cle
D14 23N Y N 7,178,000 5,319 1,002,935 1,008,254 14.04% 0.07% (5,319)
40000530 - investigation of PFAS contaminated drinking water
D17 057 Y N 1,500,000 1,393,633 28,720 1,357,102 1,385,822 92.38% 1.91% 1,364,913
40000530 - Sammamish Plateau Water and Sewer District for a municipal water treatment plant
D18 23N Y N 7,807,000 600,000 7,801,226 7,801,226 99.92% 600,000
40000533 - 2023-25 Eastern Washington Clean Sites I
D19 23N Y N 801,000 268,909 6,181 507,626 513,807 64.14% 0.77% 262,728
40000538 - 2023-25 Swift Creek Natural Asbestos Flo
D20 057 Y N 2,000,000 2,000,000 2,000,000 2,000,000 100% 2,000,000
40000539 - 2023-25 Stormwater Financial Assistance
D21 23R Y N 53,771,000 15,850,000 4,208,789 41,744,086 45,952,875 85.46% 7.82% 11,641,211
40000540 - 2023-25 Floodplains by Design
D22 26D Y N 16,972,000 5,908,687 3,178,488 13,105,639 16,284,127 95.94% 18.72% 2,730,199
D23 057 Y N 47,320,000 12,802,576 624,513 44,493,417 45,117,930 95.34% 1.31% 12,178,063
Totals 64,292,000 18,711,263 95,852,244 57,599,056 61,402,057 95.5% 5.92% 14,908,262
40000559 - 2023-25 Sunnyside Valley Irrigation Dist
D24 057 Y N 3,246,000 1,570,000 2,685,732 2,685,732 82.73% 1,570,000
40000563 - 2023-25 Water Pollution Control Revolvin
D26 727 Y N 434,808,000 80,421,920 41,613 387,270 428,883 0.09% 0.01% 80,380,307
Q03 727 Y N 101,525,000 75,000,000 3,698,000 3,698,000 3.64% 75,000,000
Totals 536,333,000 155,421,920 95,893,857 4,085,270 4,126,883 0.77% 0.01% 155,380,307
40000565 - 2023-25 Streamflow Restoration Program
A59 366 Y N 40,000,000 19,044,000 892,912 16,615,939 17,508,851 43.77% 2.23% 18,151,088
40000567 - 2023-25 Sewer Overflow & Stormwater Reus
Q01 001 Y N 16,614,000 3,975,000 11,788 2,785,263 2,797,051 16.83% 0.07% 3,963,212
40000568 - 2023-25 Waste Tire Pile Cleanup and Prev
D29 08R Y N 233,000 59,301 72,069 72,069 30.93% 30.93% (12,768)
40000569 - 2023-25 Stormwater Public Private Partne
D30 23R Y N 2,935,000 2,026,000 1,086 2,264,176 2,265,262 77.18% 0.03% 2,024,914
40000570 - Elevator Restorations at Ecology Facilit
D31 057 Y N 1,728,000 1,652,558 96,498 96,498 5.58% 1,652,558
40000571 - 2023-25 Centennial Clean Water Program
D28 23N Y N 36,305,000 6,062,250 2,945,131 23,462,092 26,407,223 72.73% 8.11% 3,117,119
40000572 - 2023-25 Yakima River Basin Water Supply
D32 057 Y N 44,368,000 20,000,000 2,546,148 15,130,034 17,676,182 39.83% 5.73% 17,453,852
40000583 - 2023-25 Columbia River Water Supply Deve
D33 296 Y N 1,500,000 695,000 13,929 477,398 491,327 32.75% 0.92% 681,071
D34 057 Y N 60,759,000 11,000,000 150,619 7,107,942 7,258,561 11.94% 0.24% 10,849,381
Totals 62,259,000 11,695,000 102,527,539 7,585,340 7,749,888 12.45% 0.26% 11,530,452
40000605 - 2023-25 Zosel Dam Preservation
D38 057 Y N 5,205,000 4,937,788 2,344 3,002,061 3,004,405 57.72% 0.04% 4,935,444
40000606 - Improving Air Quality in Overburdened Co
D39 26E Y N 20,646,000 1,437,468 2,281,718 5,437,213 7,718,931 37.38% 11.05% (844,250)
40000611 - Landfill Methane Capture
D40 26C Y N 9,697,000 2,211,917 1,112,068 8,389,414 9,501,482 97.98% 11.46% 1,099,849
40000612 - Padilla Bay Samish Conservation Area
Q02 001 Y N 113,000 54,447 574 14,823 15,397 13.62% 0.5% 53,873
40000613 - Cleanup Settlement Account Projects
D47 15H Y N 1,687,000 286,667 180,012 180,012 10.67% 286,667
40000618 - Lower Issaquah Valley PFAS Cleanup
D48 23N Y N 2,000,000 1,930,620 43,237 1,887,383 1,930,620 96.53% 2.16% 1,887,383
40000621 - 2025-27 Waste Tire Pile Cleanup and Prev
E00 08R N N 1,000,000 260,767 260,767
40000622 - 2025-27 Coastal Wetlands Federal Funds
Q31 001 N N 10,000,000
40000623 - 2025-27 Freshwater Aquatic Invasive Plan
E01 222 N N 1,300,000 398,471 36,919 188,000 224,919 17.3% 2.83% 361,552
40000624 - 2025-27 Freshwater Algae Grant Program
E02 10A N N 468,000 106,642 6,374 50,000 56,374 12.04% 1.36% 100,268
40000625 - 2025-27 Water Pollution Control Revolvin
E03 727 N N 400,000,000
Q32 727 N N 214,000,000
Totals 614,000,000 106,010,773
40000626 - 2025-27 State Match – Water Pollution Co
E04 727 N N 41,000,000 20,500,000 20,500,000
40000627 - 2025-27 Protect Investments in Cleanup R
E05 23N N N 4,450,000 1,895,892 1,895,892
40000628 - 2025-27 Eastern Washington Clean Sites I
E06 23N N N 4,250,000 1,675,000 49,211 49,211 1.15% 1,675,000
40000629 - 2025-27 Cleanup Settlement Account Proje
E07 15H N N 650,000 250,000 250,000
40000641 - 2025-27 ASARCO Everett Smelter Plume Cle
E08 23N N N 7,239,000 615,930 40,202 40,202 0.55% 0.55% 575,728
40000642 - 2025-27 Centennial Clean Water Program
E09 23N N N 40,000,000 4,357,897 797,943 797,943 1.99% 4,357,897
40000643 - 2025-27 Stormwater Financial Assistance
E10 23R N N 60,000,000 13,903,134 367,045 367,045 0.61% 0.61% 13,536,089
40000644 - 2025-27 Affordable Housing Cleanup Grant
E11 23N N N 11,000,000 440,000 440,000
40000651 - 2025-27 Product Replacement Program
E12 23N N N 2,000,000 997,683 23,747 23,747 1.18% 1.18% 973,936
40000652 - 2025-27 Reducing Toxic Wood Stove Emissions-Replace Uncertified Devices
B00 23N N Y 4,064,000 1,890,180 233,992 15,305 249,297 6.13% 5.75% 1,656,188
40000652 - 2025-27 Reducing Toxic Wood Stove Emissions-Air Agencies
B01 23N N Y 100,000 46,900 11,591 11,591 11.59% 11.59% 35,309
40000653 - 2025-27 Clean Up Toxic Sites-Puget Sound
E14 23N N N 3,000,000 300,000 2,000,000 2,000,000 66.66% 300,000
40000658 - 2025-27 Swift Creek Natural Asbestos Flo
E15 057 N N 4,000,000 2,000,000 2,000,000
40000659 - 2025-27 Reducing Diesel Greenhouse Gases
E16 23N N N 7,816,000 325,224 39,871 39,871 0.51% 0.51% 285,353
40000660 - 2025-27 Floodplains by Design
E17 057 N N 59,629,000 4,535,221 92,277 10,000,000 10,092,277 16.92% 0.15% 4,442,944
E18 26D N N 16,154,000 1,327,871 42,148 42,148 0.26% 0.26% 1,285,723
Totals 75,783,000 5,863,092 106,861,646 10,000,000 10,134,425 13.37% 0.18% 5,728,667
40000674 - 2025-27 Sunnyside Valley Irrigation Dist
E19 057 N N 3,320,000 1,531,771 1,531,771
40000681 - Odessa - OGWRP EL 22.1 pipeline project
B03 057 N Y 34,915,000 17,300,000 17,300,000
B05 296 N Y 3,585,000 1,700,000 1,700,000
Totals 38,500,000 19,000,000 106,861,646 19,000,000
40000681 - Columbia basin irrigation district title transfer
B04 057 N Y 800,000 350,000 350,000
40000681 - 2025-27 Columbia River Water Supply Deve
E20 057 N N 19,670,000 9,750,482 260,000 260,000 1.32% 9,750,482
E21 296 N N 1,415,000 705,952 705,952
Totals 21,085,000 10,456,434 106,861,646 260,000 260,000 1.23% 10,456,434
40000705 - 2025-27 Yakima River Basin Water Supply
E22 057 N N 52,020,000 25,350,562 25,350,562
40000718 - State Parks Relocation to Ecology Headquarters Building
D50 057 Y N 1,618,000 809,000 809,000
40000719 - Lower Issaquah Valley PFAS Contamination Cleanup
A00 23N Y Y 2,000,000
40000719 - 2025-27 PFAS Response
E23 23N N N 5,000,000 1,423,535 791 791 0.01% 0.01% 1,422,744
40000720 - 2025-27 Puget Sound Nutrient Reduction G
E24 057 N N 5,000,000 461,576 17,034 17,034 0.34% 0.34% 444,542
E25 23N N N 5,000,000 330,000 330,000
Totals 10,000,000 791,576 106,879,471 17,034 0.17% 0.17% 774,542
40000721 - 2025-27 Stormwater Community-Based Publi
E26 23R N N 3,000,000 1,476,652 19,321 19,321 0.64% 0.64% 1,457,331
40000724 - Chehalis Basin projects
B06 26D N Y 2,000,000
B07 057 N Y 67,779,000 1,335,950 2,930,555 2,930,555 4.32% 1,335,950
Totals 69,779,000 1,335,950 106,898,792 2,930,555 2,930,555 4.2% 1,335,950
40000724 - Chehalis Basin board staffing
B08 057 N Y 5,250,000 2,526,025 265,008 265,008 5.04% 5.04% 2,261,017
40000725 - 2025-27 Streamflow Restoration Program
E29 366 N N 40,000,000
40000726 - 2025-27 Remedial Action Grant Program
E30 23N N N 84,425,000 3,764,558 87,383 87,383 0.1% 0.1% 3,677,175
91000347 - Skagit Water
U08 057 Y N 1,521,000 750,000 750,000
91000373 - 2021-23 Water Banking
C26 057 Y N 3,707,000 1,822,944 1,036,797 1,377,911 2,414,708 65.13% 27.96% 786,147
C34 05W Y N 8,606,000 4,150,000 265,619 3,553,681 3,819,300 44.37% 3.08% 3,884,381
Totals 12,313,000 5,972,944 108,553,599 4,931,592 6,234,008 50.63% 10.58% 4,670,528
91000378 - PSCAA Ultra-fine Particle Monitoring
D42 26E Y N 29,000 19,807 19,807 19,807 68.3% 68.3%
91000383 - DDT Soil Remediation Pilot
D46 23N Y N 4,548,000 3,951,510 3,951,510 86.88%
91000390 - City of Ruston Contamination Remediation
D49 23N Y N 1,003,000 170,000 170,000
92000076 - Storm Water Improvements
U63 057 Y N 8,802,000 4,195,000 56,030 468,226 524,256 5.95% 0.63% 4,138,970
92000142 - Drought Response
T91 05W Y N 808,000 370,000 370,000
92000195 - 2022 Stormwater Projects
C35 23R Y N 4,855,000 564,000 854,900 854,900 17.6% 564,000
92000200 - North Shore Levee
D44 057 Y N 17,467,000 4,677,473 528,657 15,337,354 15,866,011 90.83% 3.02% 4,148,816
E31 057 N N 17,000,000 1,015,000 1,015,000
Totals 34,467,000 5,692,473 109,158,093 15,337,354 15,866,011 46.03% 1.53% 5,163,816
92000205 - 2023-25 Drought Response
D45 057 Y N 2,720,000 1,290,000 169,129 1,503,647 1,672,776 61.49% 6.21% 1,120,871
92000220 - Yakima Tieton Irrigation Canal
E32 057 N N 8,500,000 4,048,226 4,048,226
92000226 - Deschutes estuary restoration
B10 057 N Y 8,000,000 2,000,000 2,000,000
92000226 - Deschutes estuary project management costs
B14 057 N Y 750,000 367,428 21,937 21,937 2.92% 2.92% 345,491
461 - Department of Ecology Totals 3,204,471,000 757,495,724 109,349,159 986,727,141 1,096,076,300 34.2% 3.41% 648,146,565