Funding is provided to renovate and expand the Nicholson Pavilion, known as the "Health and Physical Education" building, to support physical education and school health programs at Central Washington University. The 60+ year old building has never had a major renovation, lacks adequate and antiquated classroom and lab space and has overall structural and infrastructure deficiencies.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 2,700,000 2,300,000 55,505,000 0 60,505,000
Funds: State Building Construction Account - State 60,505,000

Chiller Addition

40000075

CWU will have insufficient chilled water cooling capacity at the Ellensburg campus once the Health Sciences building is complete in the fall of 2021. This poses a significant risk of temperature control for sensitive science facilities requiring consistant lab environments and temperature tolerances for lab samples and research samples. Funding is provided for one 1200-ton chiller and related costs.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 3,189,000 0 3,189,000
Funds: State Building Construction Account - State 3,189,000

Humanities & Social Science Complex

40000081

Funding is provided for the design phase to replace Farrell Hall and Language and Literature building with a new Humanities and Social Sciences building. Farrell Hall and Language and Literature are failing and are too costly to repair. This project will demolish those buildings and construct a single replacement building that is connected to, and expands Brooks Library by creating student study and collaborative spaces.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 5,205,000 63,846,000 69,051,000
Funds: State Building Construction Account - State 69,051,000

Medical and Mental Health Center

40000082

Predesign funding is provided to determine the programmatic needs, preferred alternative and estimated construction costs for renovating and expanding the campus medical and mental health center to meet campus and student needs. The appropriation also includes design funding that may be allotted once the predesign is accepted.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 1,300,000 0 1,300,000
Funds: State Building Construction Account - State 1,300,000

Minor Works Preservation 2021 - 2023

40000083

Funding is provided for minor capital projects to preserve and extend the life of existing campus facilities and supporting infrastructure systems.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 8,883,000 36,448,000 45,331,000
Funds: State Building Construction Account - State 12,837,000
Funds: Central Washington University Capital Projects Account - State 32,494,000

Minor Works Program 2021 - 2023

40000084

Funding is provided for minor capital programmatic work to modernize and renew existing space to improve functionality and program delivery.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 2,000,000 20,000,000 22,000,000
Funds: State Building Construction Account - State 17,000,000
Funds: Central Washington University Capital Projects Account - State 5,000,000

Preventative Facility Maintenance/Backlog Reduction 2021-23

40000115

Funding is provided to conduct routine and preventive maintenance activities required to decrease and mitigate deferred maintenance and to maximize the life of facilities and building systems.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 2,422,000 9,688,000 12,110,000
Funds: Central Washington University Capital Projects Account - State 12,110,000