461 - Department of Ecology

Last Updated: 08/26/2025

Through July 2025

Auth Code Fund Reapprop Provisos Current Biennium Appropriation Budgeted Cost of Work (Allotted) Actual Cost of Work Outstanding Contracting Balance (Encumbered) Total Dollars Obligated Percent Obligated Percent Expended Biennium to Date Variance (Allotted - Actuals)
This Month Biennium to Date This Month Biennium to Date
19742006 - Water Supply Facilities
A31 072 Y N 295,000 37,000 295,000 295,000
19972012 - Low-Level Nuclear Waste Disposal Trench
J00 125 Y N 1,644,167 214,802 1,644,167 60,018 222,420 222,420 14% 14% 1,421,747
20042951 - Twin Lake Aquifer Recharge Project
G28 057 Y N 128,000 16,000 128,000 128,000
20052852 - Quad City Water Right Mitigation
G42 057 Y N 116,000 116,000 116,000
20081951 - Transfer of Water Rights for Cabin Owner
I05 057 Y N 57,000 56,770 56,770
30000028 - Watershed Plan Implementation and Flow A
J17 057 Y N 49,366 4,803 49,366 1,489 49,292 49,292 100% 100% 74
30000213 - Watershed Plan Implementation and Flow A
K06 057 Y N 67,000 8,330 66,530 66,530 66,530 99% 99%
30000216 - Remedial Action Grant Program
A02 23N Y N 14,401,114 2,640,740 14,401,114 148,719 2,454,034 2,454,034 17% 17% 11,947,080
30000280 - ASARCO - Tacoma Smelter Plume and Mines
K15 15H Y N 2,070,908 974,091 2,070,908 345 345 0.01% 0.01% 2,070,563
30000282 - Padilla Bay Federal Capital Projects
P04 001 Y N 60,000 1,309 45,078 45,078
30000331 - Watershed Plan Implementation and Flow A
S07 057 Y N 856,861 20,861 856,861 417,099 417,099 417,099 49% 49% 439,762
30000333 - Dungeness Water Supply & Mitigation
S09 057 Y N 375,000 30,000 375,000 177,119 177,119 47% 47% 197,881
30000334 - ASARCO Cleanup
S11 15H Y N 443,000 442,675 102,231 102,231 23% 23% 340,444
30000374 - Remedial Action Grants
A07 23N Y N 6,017,768 1,006,923 6,017,768 2,022,038 2,022,038 34% 34% 3,995,730
30000432 - Eastern Washington Clean Sites Initiativ
A09 23N Y N 4,404,477 275,426 4,404,477 17,235 4,037,098 4,037,098 92% 92% 367,379
30000458 - Remedial Action Grants
U57 057 Y N 8,836,936 2,983,000 8,836,936 1,680,404 1,680,404 19% 19% 7,156,532
30000537 - Floodplains by Design
T88 057 Y N 1,612,719 1,612,719 1,607,672 1,607,672 100% 100% 5,047
30000538 - ASARCO Cleanup
T26 15H Y N 963,230 20,438 963,230 963,230 963,230 100% 100%
30000542 - Cleanup Toxics Sites - Puget Sound
A13 23N Y N 1,879,432 307,264 1,879,432 716 657,523 657,523 35% 35% 1,221,909
30000588 - Columbia River Water Supply Development
T90 296 Y N 143,835 10,883 143,835 143,818 143,818 100% 100% 17
30000589 - Sunnyside Valley Irrigation District Wat
T25 057 Y N 1,125,000 92,000 1,125,000 1,125,000
30000590 - Yakima River Basin Water Supply
A54 355 Y N 294,000 293,910 293,910
30000591 - Watershed Plan Implementation and Flow A
T97 057 Y N 875,000 875,000 875,000
30000670 - ASARCO Cleanup
U05 15H Y N 9,538,762 3,997,916 9,538,762 38,249 5,083,834 5,083,834 53% 53% 4,454,928
30000673 - Sunnyside Valley Irrigation District Wat
U78 057 Y N 1,686,938 1,686,938 64,860 64,860 4% 4% 1,622,078
30000704 - 2015-17 Restored Eastern Washington Clea
U28 057 Y N 2,048,301 2,048,301 2,048,301 2,048,301 100% 100%
30000705 - 2017-19 Centennial Clean Water program
U96 057 Y N 3,784,394 3,784,394 129,500 3,471,455 3,471,455 92% 92% 312,939
30000706 - Floodplains by Design 2017-19
U19 057 Y N 8,015,646 359,062 8,015,646 1,571,741 7,227,530 7,227,530 90% 90% 788,116
30000707 - 2017-19 Remedial Action Grants
A14 23N Y N 998,409 312,339 837,339 26,247 26,247 3% 3% 811,092
30000708 - Swift Creek Natural Asbestos Flood Control and Cleanup
C28 057 Y N 123,000 122,656 122,656 122,656 100% 100%
30000712 - Columbia River Water Supply Development
U47 296 Y N 893,000 111,000 893,000 203,746 203,746 23% 23% 689,254
U56 057 Y N 1,288,514 35,109 1,288,514 910,978 910,978 71% 71% 377,536
Totals 2,181,514 146,109 2,181,514 33,760,460 1,114,724 94% 94% 1,066,790%
30000712 - Columbia River Water Supply Development Program
U98 10P Y N 4,203,127 284,127 4,203,127 46,803 802,558 802,558 19% 19% 3,400,569
30000714 - Watershed Plan Implementation and Flow A
U91 057 Y N 3,341,076 140,576 3,341,076 80,000 134,858 134,858 4% 4% 3,206,218
30000740 - Water Irrigation Efficiencies Program
U33 057 Y N 204,000 26,000 204,000 204,000
30000742 - 2017-19 Eastern Washington Clean Sites I
A17 23N Y N 1,727,000 302,000 1,727,000 49,373 248,042 248,042 14% 14% 1,478,958
30000763 - 2015-17 Restored Clean Up Toxics Sites -
U62 057 Y N 1,557,000 150,000 1,556,472 903,982 903,982 58% 58% 652,490
30000796 - 2017-19 Stormwater Financial Assistance
A19 23R Y N 2,882,926 2,882,926 2,731,939 2,731,939 95% 95% 150,987
U41 057 Y N 16,651,139 550,000 16,651,139 220,633 11,719,268 11,719,268 70% 70% 4,931,871
Totals 19,534,065 550,000 19,534,065 220,633 50,301,107 14,451,207 165% 165% 5,082,858%
30000797 - 2015-17 Restored Stormwater Financial As
U18 057 Y N 5,080,502 225,000 5,080,502 1,852,207 1,852,207 36% 36% 3,228,295
40000018 - VW Settlement Funded Projects
M22 001 Y N 83,575,005 21,496,638 41,200,678 141,329 24,985,368 24,985,368 30% 30% 16,215,310
40000109 - Reduce Air Pollution from Transit/Sch. B
U07 216 Y N 8,417,488 8,417,488 286,534 7,406,238 7,406,238 88% 88% 1,011,250
40000110 - 2019-21 Water Pollution Control Revolving Program
A22 727 Y N 63,940,766 63,940,766 63,940,766 63,940,766 100% 100%
40000111 - 2019-21 Sunnyside Valley Irrigation District
A23 057 Y N 2,365,833 345,000 2,365,833 35,720 35,720 2% 2% 2,330,113
40000114 - 2019-21 ASARCO Cleanup
A24 15H Y N 6,000,000 1,294,204 6,000,000 75,503 1,484,270 1,484,270 25% 25% 4,515,730
40000115 - 2019-21 Reducing Toxic Diesel Emissions
A25 216 Y N 193,310 193,310 193,310 193,310 100% 100%
40000116 - 2019-21 Centennial Clean Water Program
A26 057 Y N 9,108,471 375,000 7,700,000 7,022,503 7,022,503 77% 77% 677,497
40000117 - 2019-21 Eastern Washington Clean Sites I
A27 23N Y N 11,961,301 1,500,000 8,461,301 791,494 791,494 7% 7% 7,669,807
40000127 - Padilla Bay Federal Capital Projects
L00 001 Y N 500,000
40000129 - 2019-21 Floodplains by Design
A30 057 Y N 25,002,483 444,676 15,002,483 11,527,397 11,527,397 46% 46% 3,475,086
40000130 - 2019-21 Clean Up Toxics Sites – Puget So
A32 23N Y N 11,205,009 1,720,301 11,205,009 158,960 6,347,812 6,347,812 57% 57% 4,857,197
40000144 - 2019-21 Stormwater Financial Assistance
A33 23R Y N 21,133,417 15,711,857 386,756 11,595,802 11,595,802 55% 55% 4,116,055
40000146 - 2015 Drought Authority
A34 05W Y N 669,000 85,000 669,000 75,418 75,418 11% 11% 593,582
40000149 - Healthy Housing Remediation Program
A37 23N Y N 2,671,820 2,671,820 2,643,533 2,643,533 99% 99% 28,287
40000152 - 2019-21 Columbia River Water Supply Deve
A39 296 Y N 2,254,960 280,960 2,254,960 2,344 1,862,307 1,862,307 83% 83% 392,653
A40 057 Y N 15,088,289 625,400 15,088,289 148,920 6,208,499 6,208,499 41% 41% 8,879,790
Totals 17,343,249 906,360 17,343,249 151,264 198,273,751 8,070,806 124% 124% 9,272,443%
40000152 - 2019-21 Columbia River Water Supply Development Program
A41 355 Y N 10,360,000 1,070,000 10,360,000 370,052 370,052 4% 4% 9,989,948
40000177 - 2019-21 Streamflow Restoration Program
A42 366 Y N 25,554,350 564,350 25,554,350 59,346 9,639,792 9,639,792 38% 38% 15,914,558
40000179 - 2019-21 Yakima River Basin Water Supply
A43 057 Y N 12,612,121 357,087 12,612,121 162,144 8,250,306 8,250,306 65% 65% 4,361,815
40000193 - Zosel Dam Preservation
A44 057 Y N 80,000 10,000 80,000 1,870 1,870 2% 2% 78,130
40000194 - 2019-21 Protect Investments in Cleanup R
A45 23N Y N 4,016,241 500,000 4,016,241 25,350 2,372,891 2,372,891 59% 59% 1,643,350
40000209 - 2019-21 Chehalis Basin Strategy
A47 057 Y N 17,942,221 17,942,221 17,942,221 17,942,221 100% 100%
40000210 - Chemical Action Plan Implementation
A48 23N Y N 261,000 26,100 261,000 260,475 260,475 100% 100% 525
40000211 - 2019-21 Remedial Action Grants
A49 23N Y N 30,696,016 5,000,000 30,696,016 15,389,862 15,389,862 50% 50% 15,306,154
40000286 - 2020 Eastern Washington Clean Sites Init
A21 23N Y N 575,363 60,602 575,363 575,363 575,363 100% 100%
40000288 - 2020 Remedial Action Grants
A57 23N Y N 18,717,789 2,717,789 18,717,789 8,653 8,778,975 8,778,975 47% 47% 9,938,814
40000303 - 2021-23 ASARCO Everett Smelter Plume Cle
C00 23N Y N 10,542,410 1,763,231 10,542,410 399,030 2,577,422 2,577,422 24% 24% 7,964,988
40000304 - 2021-23 Remedial Action Grant Program
C01 23N Y N 64,765,492 10,000,000 64,765,492 79,013 4,896,405 4,896,405 8% 8% 59,869,087
40000336 - 2021-23 Stormwater Financial Assistance
C02 23R Y N 62,707,847 46,324,978 84,503 29,028,486 29,028,486 46% 46% 17,296,492
40000337 - 2021-23 Water Pollution Control Revolvin
C03 727 Y N 225,000,000 225,000,000 224,953,597 224,953,597 100% 100% 46,403
N01 727 Y N 7,864,520 7,864,520 7,864,520 7,864,520 100% 100%
Totals 232,864,520 232,864,520 531,175,988 232,818,117 200% 200% 46,403%
40000338 - 2021-23 Waste Tire Pile Cleanup and Prev
C04 08R Y N 122,140 122,140 122,002 122,002 100% 100% 138
40000340 - 2021-23 Eastern Washington Clean Sites I
C06 23N Y N 20,241,905 2,000,000 10,241,905 1,553,406 3,509,090 3,509,090 17% 17% 6,732,815
40000346 - 2021-23 Clean Up Toxic Sites – Puget Sou
C07 23N Y N 4,594,894 1,344,894 4,594,894 1,357 1,428,755 1,428,755 31% 31% 3,166,139
40000359 - 2021-23 Centennial Clean Water Program
C08 23N Y N 31,854,472 1,625,000 27,450,000 1,061,178 16,983,967 16,983,967 53% 53% 10,466,033
40000360 - 2021-23 Protect Investments in Cleanup R
C09 23N Y N 9,878,699 2,060,249 9,878,699 76,127 2,331,085 2,331,085 24% 24% 7,547,614
40000371 - 2021-23 Reducing Toxic Wood Stove Emissi
C10 23N Y N 473,205 473,205 458,500 458,500 97% 97% 14,705
40000375 - 2021-23 Freshwater Aquatic Invasive Plan
C11 222 Y N 779,327 779,327 265,740 265,740 34% 34% 513,587
40000376 - 2021-23 Freshwater Algae Grant Program
C12 10A Y N 410,607 410,607 101,666 101,666 25% 25% 308,941
40000378 - 2021-23 Healthy Housing Remediation
A51 23N Y N 5,553,480 1,244,883 5,553,480 53,898 3,822,823 3,822,823 69% 69% 1,730,657
40000386 - 2021-23 ASARCO Tacoma Smelter Plume Clea
C14 15H Y N 3,000,000
40000387 - 2021-23 Chehalis Basin Strategy
C15 057 Y N 49,757,176 11,910 49,757,176 4,860,552 33,637,106 33,637,106 68% 68% 16,120,070
40000388 - 2021-23 Coastal Wetlands Federal Funds
N02 001 Y N 10,713,829 10,713,829 895,866 9,731,645 9,731,645 91% 91% 982,184
40000389 - 2021-23 Floodplains by Design
C16 057 Y N 37,385,323 1,236,728 26,385,323 299,941 22,669,481 22,669,481 61% 61% 3,715,842
40000390 - 2021-23 Reducing Diesel GHG & Toxic Emis
C17 23N Y N 14,022,947 14,022,947 12,705,965 12,705,965 91% 91% 1,316,982
40000391 - 2021-23 Sunnyside Valley Irrigation Dist
C18 057 Y N 4,281,000 191,000 4,281,000 590,634 590,634 14% 14% 3,690,366
40000396 - 2021-23 Puget Sound Nutrient Reduction G
C19 057 Y N 8,205,236 332,300 7,135,342 13,168 4,570,391 4,570,391 56% 56% 2,564,951
40000397 - 2021-23 Streamflow Restoration Program
C20 366 Y N 39,038,555 4,603,943 39,038,555 302,220 9,613,655 9,613,655 25% 25% 29,424,900
40000399 - 2021-23 Columbia River Water Supply Deve
C21 296 Y N 1,446,661 98,310 1,446,661 3,263 543,437 543,437 38% 38% 903,224
C22 057 Y N 38,178,654 1,698,603 38,178,654 336,795 8,008,013 8,008,013 21% 21% 30,170,641
Totals 39,625,315 1,796,913 39,625,315 340,058 662,269,943 8,551,450 59% 59% 31,073,865%
40000422 - 2021-23 Yakima River Basin Water Supply
C23 057 Y N 17,720,000 627,902 17,720,000 2,601,752 2,601,752 15% 15% 15,118,248
40000436 - 2021-23 Product Replacement Program
C24 23N Y N 3,405,573 489,767 3,405,573 279,526 2,832,600 2,832,600 83% 83% 572,973
40000464 - Pacific Wood Treating Site Cleanup – Cle
C29 15H Y N 2,326,000 1,000,000 2,326,000 41,510 383,049 383,049 16% 16% 1,942,951
40000465 - 2022 Clean Up Toxic Sites – Puget Sound
C30 23N Y N 3,989,003 1,000,000 3,989,003 251,501 251,501 6% 6% 3,737,502
40000470 - 2022 Community-Based Public-Private Stor
C32 23R Y N 930,937 930,937 50,221 675,288 675,288 73% 73% 255,649
40000473 - 2022 Water Pollution Control Revolving P
C33 727 Y N 200,000,000 200,000,000 16,473,961 88,795,590 88,795,590 44% 44% 111,204,410
40000474 - 2023-25 Reducing Diesel Greenhouse Gases (GHG) and Toxic Emissions
D00 23N N N 15,632,000 861,465 15,632,000 410,198 6,141,018 6,141,018 39% 39% 9,490,982
40000475 - 2023-25 Coastal Wetlands Federal Funds
Q00 001 N N 14,000,000 743,328 5,400,000 5,400,000
40000476 - 2023-25 Chehalis Basin Strategy Projects
D07 057 N Y 66,100,000 1,636,933 21,100,000 1,591,730 21,100,000 21,100,000 32% 32%
40000476 - 2023-25 Chehalis Basin Strategy Operations
D08 057 N Y 3,900,000 160,169 3,900,000 212,998 3,355,353 3,355,353 86% 86% 544,647
40000477 - 2023-25 Freshwater Aquatic Invasive Plants
D02 222 N N 1,700,000 61,926 1,361,498 53,893 937,611 937,611 55% 55% 423,887
40000478 - 2023-25 Freshwater Algae Grant Program
D03 10A N N 710,000 29,632 601,475 4,748 349,337 349,337 49% 49% 252,138
40000479 - 2023-25 Reducing Toxic Wood Stove Emissions
D05 23N N Y 4,044,000 493,960 4,044,000 134,994 3,888,824 3,888,824 96% 96% 155,176
40000479 - 2023-25 Wood Stove - Air Agencies
D06 23N N Y 100,000 100,000 100,000
40000480 - 2023-25 Affordable Housing Cleanup Grant Program
D09 23N N N 9,205,000 1,946,000 9,205,000 20,085 870,565 870,565 9% 9% 8,334,435
40000486 - 2023-25 Product Replacement Program
D10 23N N N 6,500,000 1,245,734 6,500,000 121,279 1,805,831 1,805,831 28% 28% 4,694,169
40000487 - 2023-25 Clean Up Toxic Sites – Puget Sound
D11 23N N N 7,455,000 1,500,000 4,455,000 83 83 4,454,917
40000495 - 2023-25 Remedial Action Grant Program
D12 23N N N 115,111,000 10,061,585 43,124,000 797,513 4,979,870 4,979,870 4% 4% 38,144,130
40000526 - 2023-25 Protect Investments in Cleanup Remedies
D13 23N N N 4,450,000 500,000 2,450,000 280,728 280,728 6% 6% 2,169,272
40000529 - 2023-25 ASARCO Everett Smelter Plume Cleanup
D14 23N N N 7,679,000 1,047,707 5,179,000 34,607 676,380 676,380 9% 9% 4,502,620
40000530 - investigation of PFAS contaminated drinking water
D17 057 N Y 1,500,000 250,000 1,500,000 12,161 106,367 106,367 7% 7% 1,393,633
40000530 - Sammamish Plateau Water and Sewer District for a municipal water treatment plant
D18 23N N Y 7,857,000 2,000,000 7,857,000 55,774 55,774 0.70% 0.70% 7,801,226
40000533 - 2023-25 Eastern Washington Clean Sites Initiative
D19 23N N N 950,000 450,000 950,000 5,010 228,947 228,947 24% 24% 721,053
40000538 - 2023-25 Swift Creek Natural Asbestos Flood Control and Cleanup
D20 057 N N 4,000,000 4,000,000 2,000,000 2,000,000 50% 50% 2,000,000
40000539 - 2023-25 Stormwater Financial Assistance Program
D21 23R N N 68,000,000 2,006,184 29,265,112 316,594 20,931,158 20,931,158 31% 31% 8,333,954
40000540 - 2023-25 Floodplains by Design
D22 26D N N 17,592,000 1,088,566 7,592,000 774,633 774,633 4% 4% 6,817,367
D23 057 N N 49,800,000 3,076,786 19,800,000 (325) 4,053,291 4,053,291 8% 8% 15,746,709
Totals 67,392,000 4,165,352 27,392,000 (325) 830,345,493 4,827,924 13% 13% 22,564,076%
40000559 - 2023-25 Sunnyside Valley Irrigation District
D24 057 N N 3,246,000 407,953 3,246,000 9,268 9,268 0.28% 0.28% 3,236,732
40000563 - 2023-25 Water Pollution Control Revolving Program
D26 727 N N 435,000,000 22,830 75,000,000 23,407 312,399 312,399 0.07% 0.07% 74,687,601
Q03 727 N N 200,000,000 200,000,000 216,285 100,498,480 100,498,480 50% 50% 99,501,520
Totals 635,000,000 22,830 275,000,000 239,692 931,165,640 100,810,879 50% 50% 174,189,121%
40000564 - 2023-25 State Match - Water Pollution Control Revolving Program
D27 727 N N 35,000,000 35,000,000 16,983,000 16,983,000 49% 49% 18,017,000
40000565 - 2023-25 Streamflow Restoration Program
A59 366 Y N 40,000,000 2,000,000 20,000,000 207,376 1,383,842 1,383,842 3% 3% 18,616,158
40000567 - 2023-25 Sewer Overflow & Stormwater Reuse Municipal Grants Prog
Q01 001 N N 16,700,000 6,000,000 169,949 169,949 1% 1% 5,830,051
40000568 - 2023-25 Waste Tire Pile Cleanup and Prevention
D29 08R N N 1,000,000 84,339 1,000,000 13,768 729,547 729,547 73% 73% 270,453
40000569 - 2023-25 Stormwater Public Private Partnerships
D30 23R N N 3,000,000 170,587 2,333,838 9,497 124,055 124,055 4% 4% 2,209,783
40000570 - Elevator Restorations at Ecology Facilities
D31 057 N N 1,735,000 1,735,000 82,442 82,442 5% 5% 1,652,558
40000571 - 2023-25 Centennial Clean Water Program
D28 23N N N 40,000,000 625,000 12,000,000 1,143,375 9,425,802 9,425,802 24% 24% 2,574,198
40000572 - 2023-25 Yakima River Basin Water Supply
D32 057 N N 49,000,000 2,365,281 49,000,000 591,802 8,976,546 8,976,546 18% 18% 40,023,454
40000583 - Odessa - OGWRP EL 22.1 Pipeline Turnouts Project
D25 057 N Y 5,500,000 450,000 5,500,000 5,500,000
40000583 - 2023-25 Columbia River Water Supply Development Program
D33 296 N N 1,500,000 83,000 1,500,000 6,777 8,674 8,674 0.57% 0.57% 1,491,326
D34 057 N N 25,550,000 1,425,741 25,550,000 250,196 2,472,631 2,472,631 10% 10% 23,077,369
Totals 27,050,000 1,508,741 27,050,000 256,973 971,522,128 2,481,305 10% 10% 24,568,695%
40000583 - Odessa Groundwater Replacement Project
D35 057 N Y 32,800,000 1,800,000 32,800,000 3,771,380 10,860,292 10,860,292 33% 33% 21,939,708
40000583 - 2023-25 Columbia River - USBR Transfer
D36 057 N Y 850,000 44,000 850,000 850,000
40000604 - Product Testing Laboratory
D37 057 N N 350,000 350,000 110,572 110,572 32% 32% 239,428
40000605 - 2023-25 Zosel Dam Preservation
D38 057 N N 5,549,000 1,120,380 5,549,000 952 611,212 611,212 11% 11% 4,937,788
40000606 - Improving Air Quality in Overburdened Communities Initiative
D39 26E N N 21,400,000 4,200,896 9,316,933 399,495 2,023,734 2,023,734 9% 9% 7,293,199
40000611 - Landfill Methane Capture
D40 26C N N 10,100,000 6,167,642 10,100,000 27,556 623,227 623,227 6% 6% 9,476,773
40000612 - Padilla Bay Samish Conservation Area
Q02 001 N N 2,333,000 39,784 2,332,854 4,484 2,251,441 2,251,441 97% 97% 81,413
40000613 - Cleanup Settlement Account Projects
D47 15H N N 2,200,000 1,120,000 2,200,000 513,224 513,224 23% 23% 1,686,776
40000618 - Lower Issaquah Valley PFAS Cleanup
D48 23N N N 2,000,000 1,000,000 2,000,000 31,753 69,380 69,380 3% 3% 1,930,620
40000718 - State Parks Relocation to Ecology Headquarters Building
D50 057 N N 1,618,000 1,618,000 1,618,000 1,618,000
91000347 - Skagit Water
U08 057 Y N 1,521,000 185,000 1,521,000 1,521,000
91000359 - PFAS Pilot Project
C25 057 Y N 134,157 134,157 134,157 134,157 100% 100%
91000373 - 2021-23 Water Banking
C26 057 Y N 4,520,012 465,794 4,520,012 (270,904) 542,552 542,552 12% 12% 3,977,460
C34 05W Y N 9,000,000 900,000 9,000,000 (146,195) 294,670 294,670 3% 3% 8,705,330
Totals 13,520,012 1,365,794 13,520,012 (417,099) 989,556,589 837,222 15% 15% 12,682,790%
91000378 - PSCAA Ultra-fine Particle Monitoring
D42 26E N N 400,000 400,000 380,193 380,193 95% 95% 19,807
91000382 - PFAS Statewide Funding Strategy
D43 23N N N 400,000 22,987 400,000 528 181,306 181,306 45% 45% 218,694
91000383 - DDT Soil Remediation Pilot
D46 23N N N 5,000,000 1,500,000 5,000,000 476,314 949,765 949,765 19% 19% 4,050,235
91000390 - City of Ruston Contamination Remediation
D49 23N N N 1,109,000 409,000 1,109,000 105,581 105,581 10% 10% 1,003,419
92000076 - Storm Water Improvements
U63 057 Y N 15,306,995 550,000 11,400,000 176,950 6,939,323 6,939,323 45% 45% 4,460,677
92000142 - Drought Response
T91 05W Y N 1,189,241 47,000 1,189,241 418,163 418,163 35% 35% 771,078
92000193 - Pier 63 Creosote Removal
C27 23N Y N 362,119 362,119 362,119 362,119 100% 100%
92000195 - 2022 Stormwater Projects
C35 23R Y N 4,855,000 3,027,500 3,027,500
92000200 - North Shore Levee
D44 057 N N 18,500,000 2,044,642 6,500,000 1,868,300 1,868,300 10% 10% 4,631,700
92000205 - 2023-25 Drought Response
D45 057 N N 3,000,000 369,000 3,000,000 390,326 390,326 13% 13% 2,609,674
461 - Department of Ecology Totals 2,782,845,216 145,337,657 2,012,152,859 41,753,230 1,001,151,665 5,951% 5,951% 1,011,001,194%