Department of Transportation - Preservation

  Average Annual FTEs Near General Fund State Other Funds Total Funds
  (Dollars in Thousands)
Current Budget 863.0 0 1,132,723 1,132,723
2023-25 Maintenance Level 0.0 0 0 0
Difference from 2023-25 Original (863.0) 0 (1,132,723) (1,132,723)
% Change from 2023-25 Original (100.0%) 0.0% (100.0%) (100.0%)

2023 Policy Other Changes

Capital Projects 863.0 0 809,703 809,703
EV Infrastructure Plan 0.0 0 31 31
2023 Policy Other Changes Total 863.0 0 809,734 809,734
Total Policy Changes 863.0 0 809,734 809,734
2023-25 Policy Level 863.0 0 809,734 809,734
Difference from 2021-23 0.0 0 (322,989) (322,989)
% Change from 2023-25 Original 0.0% 0.0% (28.5%) (28.5%)

Policy Changes

Capital Projects

Funding is provided for projects that maintain the structural integrity of the existing highway system, including preservation or rehabilitation of roadway pavements, safety features, bridges and other structures and facilities. Projects are detailed in the TEIS list. (Connecting WA account - State, Move Ahead WA Account - State, Motor Vehicle Account - Federal, other funds)

EV Infrastructure Plan

The department will use this funding to pay for a plan to support the installation of electric vehicle (EV) infrastructure equipment. (Transportation Equipment Account - Non-Appropriated, Motor Vehicle Account - State, Puget Sound Ferry Operations Acct - State)