Capital Two-Year Agency Detail - Department of Corrections

SW: Electric Car Chargers

40000178

This project will fund design to provide direct current (DC) fast and level 2 networked charging stations at prison and re-entry center facilities without charging infrastructure for fleet, staff and visitor vehicles. DC fast charging stations will reduce time a vehicle is offline to charge, significantly increase the availability of mission-critical vehicles and reduce range limitations.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
600,000 3,744,000 4,344,000
State Building Construction Account - State 4,344,000

WCC: Interim Mental Health Building

40000260

Funding is increased due to updated information from the 2021-23 biennium.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
15,000 285,000 300,000
State Building Construction Account - State 300,000

WCCW: MSC Living Unit Bathroom Renovations

40000263

Design funding is provided to remodel 12 bathrooms, ensuring they will be ADA complaint and water resistant. New finishes will be more durable, reduce maintenance needed to keep the bathrooms operational and provide a longer life span.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
500,000 8,290,000 8,790,000
State Building Construction Account - State 8,790,000

SW: Security Electronics Renewal & Adaptation

40000523

Funding is provided for a statewide condition assessment of security electronics systems at correctional facilities. Door controls, door intercoms, associated programmable logic controllers (PLC), access control, radios, and integration with video surveillance will be assessed to provide an analysis of the operational status, condition, expected remaining service life, technology, and other indicators of the security electronics systems.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
1,000,000 1,000,000
State Building Construction Account - State 1,000,000

SW: Fire Alarm Systems Stabilization Project

40000524

This conditions assessment will provide direction for a statewide fire alarm stabilization plan and a more comprehensive idea of what systems have exceeded their expected useful life, are no longer code compliant or have manufacturer support for technology, parts, or repairs. It will prioritize immediate replacement needs, rank systems according to need and provide plans for ongoing replacement of systems and cost for these projects.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
750,000 750,000
State Building Construction Account - State 750,000

SW: Perimeter Fence Detection Stabilization Project

40000525

Funding is provided for a statewide condition assessment on perimeter fence detection systems to provide direction on a statewide perimeter fence detection stabilization plan. The assessment will determine what systems have exceeded their useful life or no longer have manufacturer support for parts and repairs, identify immediate replacement needs to avoid failures, rank systems according to need, and provide plans for perimeter fence detection systems replacement.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
750,000 750,000
State Building Construction Account - State 750,000

WSP: IMU South Fire Protection & Smoke Dampers

40000526

Funding is provided to replace the smoke control and energy management controls system (EMCS) and upgrade the fire control system to get back into compliance. New controls and systems will return operations to normal, eliminate the need for permanent 24/7 fire watch and return staff to their primary duties.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
4,622,000 4,622,000
State Building Construction Account - State 4,622,000

CBPS: WCCW Women's Elder Care Unit

40000527

Predesign funding is provided for a female elder care unit to support aging and infirm female incarcerated individuals. The unit will be ADA compliant, provide housing, health services, improved safety, and required level of care.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
400,000 400,000
State Building Construction Account - State 400,000

WCC: Medical Intake Tent Replacement

40000528

Funds replacement of the temporary tent with a semi-permanent modular building, providing more appropriate space for incarcerated individuals receiving initial medical, dental, and mental health screenings required for intake.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
1,400,000 1,400,000
State Building Construction Account - State 1,400,000