Capital Two-Year Agency Detail - Department of Fish and Wildlife
Ringold Hatchery Replace Ponds
40000101
This funding is for design of hatchery improvements. The vinyl raceways have far exceeded their lifespan and require frequent lengthy repairs. These raceways are used for intermediate rearing of steelhead, tiger muskies and rainbow fry. The production at this hatchery is part of the US v Oregon decision and includes the four treaty Tribes on the Columbia River.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
200,000 | 200,000 |
State Building Construction Account - State | 200,000 |
Statewide Hatcheries – Domestic Water Systems and Piping
40000233
This funding will replace old and failing domestic water lines for two systems at residences and workspaces that are out of compliance with Department of Health standards. Investing in hatchery infrastructure will ensure hatchery staff and their families have clean and safe drinking water, and improve the overall quality of life at the hatchery complex. These projects are on existing hatchery facilities and within the existing developed hatchery footprint.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
275,000 | 275,000 |
State Building Construction Account - State | 275,000 |
Sekiu Boat Ramp Acquisition
40000255
Funds the purchase of the Seiku boat ramp property in northwest Clallam County. This acquistion will ensure long-term boating access for public recreational fishing at the oldest operating fishing resort in Washington state.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
2,703,000 | 1,312,000 | 4,015,000 |
State Building Construction Account - State | 4,015,000 |