Brief description of significant agency actions for which the agency is initiating an environmental justice assessment.
Install underground power cable from the Bainbridge Island Murden Cove Puget Sound Energy (PSE) substation approximately 2.5 miles within State Route (SR) 305 right of way to metering and distribution equipment at the holding lanes, and then to a vessel charging system at terminal trestle slip 1.
Methods for providing public comment for agency consideration as part of the environmental justice assessment.
WSFelectrification@WSDOT.WA.GOV
Status
Project location
Address
487 Olympic Dr SE, Bainbridge Island, WA 98110
Geolocation

Geolocation is 47.622885, -122.5107