University of Washington
Anderson Hall Renovation
20091002
Funding is provided for the construction phase of the Anderson Hall Renovation.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 11,950,000 | 0 | 11,950,000 |
Funds: Institutions of Higher Education - Dedicated Local Account - Non-Appr | 11,950,000 |
UW Major Infrastructure
30000808
Funding is provided to continue seismic improvements of unreinforced masonry buildings on UW's Seattle Campus.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
40,043,000 | 7,432,000 | 7,325,000 | 10,300,000 | 42,300,000 | 107,400,000 |
Funds: University of Washington Building Account - State | 107,400,000 |
Magnuson Health Sciences Phase II- Renovation/Replacement
40000049
Funding is provided for the construction phase of the Magnuson Health Sciences Phase II - Renovation/Replacement.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 2,100,000 | 0 | 2,100,000 |
Funds: Institutions of Higher Education - Dedicated Local Account - Non-Appr | 2,100,000 |
Intellectual House - Phase 2
40000100
Funding is provided for design and construction of the Intellectual House - Phase 2. These new funds come from philanthropy and local sources.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 6,300,000 | 0 | 6,300,000 |
Funds: Institutions of Higher Education - Dedicated Local Account - Non-Appr | 6,300,000 |
Chemical Sciences & Bagley Hall
40000146
Funding is provided for construction work associated with the Chemical Sciences Building project. In addition to the new building, the university will address significant deferred maintenance and increase undergraduate capacity through the demolition of the Chemistry Library and renovations of existing chemistry spaces in Bagley Hall.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 5,000,000 | 185,000,000 | 100,000,000 | 290,000,000 |
Funds: State Building Construction Account - State | 129,000,000 |
Funds: Institutions of Higher Education - Dedicated Local Account - Non-Appr | 161,000,000 |
Clean Energy Transformation 25-27
40000148
Funding is provided to support the university's Clean Energy Transformation efforts across the Seattle Campus, which seeks to increase energy efficiency, convert from steam to hot water heating, improve central cooling, electrify heating with heat pumps, and evaluate emerging technologies to achieve full decarbonization. Funding this biennium will go towards District Energy Standards/Basis of Design and Micro District – South of Pacific.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 33,000,000 | 0 | 33,000,000 |
Funds: State Building Construction Account - State | 33,000,000 |
Infrastructure Renewal 25-27
40000159
Funds a variety of infrastructure renewal projects across the UW Seattle Campus. Infrastructure renewal enables the university to solve major deficiencies that cannot be solved via the Minor Works Program.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 29,350,000 | 0 | 29,350,000 |
Funds: University of Washington Building Account - State | 29,350,000 |
UW Tacoma - Campus Power Repairs (Phase 3)
40000160
Funding is provided for the design and construction of the UW Tacoma (UWT) - Campus Power Repairs - Phase 3. This includes a medium voltage switch lineup to replace the failed main switch at the UWT campus. This phase will enable UWT to move back to a permanent solution and return leased equipment to Tacoma Power. The solution will also include design and construction of a new duct bank to provide a pathway to the new switch gear, and a pathway back to Main Vault 1 that will connect the new equipment with the existing campus infrastructure.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 3,900,000 | 0 | 3,900,000 |
Funds: State Building Construction Account - State | 3,900,000 |
UW Bothell - Asset Preservation (Minor Works ) 25-27
40000161
Funds miscellaneous repair and renewal projects for the Bothell Campus, such as code and safety projects, electrical, exteriors, infrastructure, interiors, mechanical, site work and utilities. These projects support ongoing campus preservation and renewal efforts to provide facilities that will meet the needs of increasing student enrollment, programs and an enhanced student experience.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 4,530,000 | 0 | 4,530,000 |
Funds: University of Washington Building Account - State | 4,530,000 |
UW Seattle - Asset Preservation (Minor Works) 25-27
40000163
Provides funding for miscellaneous repair and renewal projects for the Seattle Campus, such as code and safety projects, electrical, exteriors, infrastructure, interiors, mechanical, site work and utilities. These projects support ongoing campus preservation and renewal efforts to provide facilities that will meet the needs of increasing student enrollment, programs and an enhanced student experience.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 22,080,000 | 0 | 22,080,000 |
Funds: University of Washington Building Account - State | 22,080,000 |
UW Tacoma - Asset Preservation (Minor Works ) 25-27
40000164
Funds miscellaneous repair and renewal projects for the Tacoma Campus, such as code and safety projects, electrical, exteriors, infrastructure, interiors, mechanical, site work and utilities. These projects support ongoing campus preservation and renewal efforts to provide facilities that will meet the needs of increasing student enrollment, programs and an enhanced student experience.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 5,415,000 | 0 | 5,415,000 |
Funds: University of Washington Building Account - State | 5,415,000 |
Ctr for Advanced Materials and Clean Energy Research Test Beds
91000016
This project was originally funded in the 2015-17 biennium ($9 million) and the 2017-19 biennium ($20 million). Reappropriations are required for this project due to issues related to previous developer selection litigation and current developer financing constraints which have delayed the project for several years. The university is also working with Seattle City Light and the developer to determine electrical service vault locations and proposed tunnel/utility connections to service the site.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 263,100,000 | 0 | 263,100,000 |
Funds: Institutions of Higher Education - Dedicated Local Account - Non-Appr | 263,100,000 |
Preventive Facility Maintenance and Building System Repairs
91000029
Funding is provided for preventive facility maintenance and building system repairs.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
0 | 0 | 0 | 25,825,000 | 0 | 25,825,000 |
Funds: University of Washington Building Account - State | 25,825,000 |
UW Tacoma Campus Soil Remediation
92000002
This provides funding to continue the ongoing remedial investigation at the UW Tacoma campus and prepare any necessary reporting. These regulatory requirements are stipulated in an agreed order, which is enforced by the Department of Ecology. Costs associated with the legacy contamination across campus, including assessments of sites being considered for purchase or development, are also funded.
Prior Biennium | Current Biennium | Reappropriations | Appropriations | Future Cost | Total Costs |
---|---|---|---|---|---|
1,786,000 | 43,000 | 3,957,000 | 2,000,000 | 8,000,000 | 15,786,000 |
Funds: Model Toxics Control Capital Account - State | 15,786,000 |