Community and Technical College System

Olympic Innovation and Technology Learning Center

40000103

Funding is provided to construct a new 31,864-gross-square-foot Innovation and Technology Learning Center. The center will house five different, unique STEM-focused computer-based lab spaces including a Maker Space, multiple modern, flexible classrooms, office space and a variety of informal collaborative spaces. The center will co-locate shared-use active learning classrooms, hands-on labs, and student study space that will provide contemporary, high-tech learning environments for a wide range of the college’s STEM programs with tutoring and support services for K-12, veterans and military service students.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 717,000 1,835,000 31,854,000 0 34,406,000
Funds: State Building Construction Account - State 33,606,000
Funds: Institutions of Higher Education - Plant Accounts - Non-Appr 800,000

Lower Columbia: Center for Vocational and Transitional Studies

40000106

Funding is provided to replace 48,795 gross square feet (GSF) in the three oldest building on campus with a single new 50,694 GSF facility.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 1,538,000 1,668,000 45,196,000 0 48,402,000
Funds: State Building Construction Account - State 48,402,000

Columbia Basin: Performing Arts Building Replacement

40000108

The project will replace a 37,170-gross-square-foot (GSF) building with a new 58,668 GSF facility.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 54,548,000 0 54,548,000
Funds: State Building Construction Account - State 54,548,000

Edmonds: Triton Learning Commons

40000114

The project will renovate 5,411 gross square feet (GSF) and add 39,010 GSF to the existing library and student services facility (Lynnwood Hall).

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 3,154,000 502,000 43,716,000 0 47,372,000
Funds: State Building Construction Account - State 47,372,000

Whatcom: Technology and Engineering Center

40000137

The project will construct a new 52,000-gross-square-foot facility on the college campus.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 51,042,000 0 51,042,000
Funds: State Building Construction Account - State 51,042,000

Cascadia: CC5 Gateway building

40000222

Funding is provided to construct a new 37,200-gross-square-foot building on the Cascadia campus.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 1,895,000 1,201,000 40,034,000 0 43,130,000
Funds: State Building Construction Account - State 43,130,000

Minor Works - Program Improvements (25-27)

40001051

Every community and technical college has an ongoing need to renovate or upgrade program areas. These minor works projects ensure that college facilities remain suitable for student needs by meeting changing program requirements and providing an adequate educational environment.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 45,743,000 0 45,743,000
Funds: State Building Construction Account - State 27,446,000
Funds: Community/Technical College Capital Projects Account - State 18,000,000
Funds: Institutions of Higher Education - Plant Accounts - Non-Appr 297,000

Minor Works - Preservation (25-27)

40001110

The community and technical college system owns roughly 21 million square feet of space. Unforeseen capital repair requirements emerge each year from storm damage, general aging of utilities, roof deterioration, and component failures in boiler and HVAC systems. Facility renovations are also required to accommodate unanticipated installation of new equipment and programmatic changes that are not part of the maintenance and operations budget.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 33,325,000 0 33,325,000
Funds: Community/Technical College Capital Projects Account - State 31,325,000
Funds: Model Toxics Control Capital Account - State 2,000,000

Grays Harbor College: Lake Swano Dam

40001150

This project will fund an alternatives analysis and design to replace or reconstruct Lake Swano Dam at Grays Harbor College.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 1,000,000 0 1,000,000
Funds: State Building Construction Account - State 1,000,000

COP for Columbia Basin Student Housing Construction

40001151

Authority is provided for the State Board to finance up to $18,000,000 backed by local funding to construct a new, on-campus student housing facility with up to 158 beds.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 18,000,000 0 18,000,000
Funds: Certificate of Participation - Non-Appr 18,000,000

COP for Edmonds College Student Housing Acquisition

40001152

Authority is provided for the State Board to finance up to $9,000,000 backed by local funding to purchase a privately owned dormitory currently housing Edmonds college students.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 9,000,000 0 9,000,000
Funds: Certificate of Participation - Non-Appr 9,000,000

Minor Works - Roof Repairs (25-27)

40001190

Funding is provided to repair or replace roof components to maintain educational programs and preserve building condition.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 12,153,000 0 12,153,000
Funds: Community/Technical College Capital Projects Account - State 12,153,000

Minor Works - Site Repairs (25-27)

40001226

Funding is provided to repair or replace campus site components to maintain educational programs and preserve site condition.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 4,771,000 0 4,771,000
Funds: State Building Construction Account - State 4,771,000

Minor Works - Infrastructure replacement (25-27)

40001262

Funding is provided to repair or replace infrastructure components to maintain access to educational programs and preserve campus condition.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 43,400,000 0 43,400,000
Funds: State Building Construction Account - State 43,400,000

Minor Works - Facility Repairs (25-27)

40001298

Funding is provided to repair or replace building components to maintain educational programs and preserve building condition.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 47,554,000 0 47,554,000
Funds: State Building Construction Account - State 47,554,000

Clean Buildings Compliance - Equipment Inventory and Reporting

40001333

This project addresses two key requirements of the Clean Buildings Performance Standard – documenting a complete inventory of all building equipment and systems as a basis for operations and maintenance plans, and hiring qualified persons who must submit the required compliance reports.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 5,490,000 0 5,490,000
Funds: State Building Construction Account - State 5,490,000

Preventive Facility Maintenance & Bldg System Repairs

40001334

Funding is provided for routine facility maintenance and utility costs.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 22,800,000 91,200,000 114,000,000
Funds: Community/Technical College Capital Projects Account - State 114,000,000

COP for Clover Park Technical College: Eastside Training Facility

40001336

Authority is provided for the State Board to enter into an alternative financing agreement for the Clover Park Eastside Training Facility.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 15,000,000 0 15,000,000
Funds: Certificate of Participation - Non-Appr 15,000,000

2025-27 Career Preparation and Launch Grants

40001337

Funding is provided for competitive grants to community and technical colleges to purchase and install equipment that expand career connected learning opportunities.

Prior Biennium Current Biennium Reappropriations Appropriations Future Cost Total Costs
0 0 0 5,000,000 0 5,000,000
Funds: State Building Construction Account - State 5,000,000